MRP Planning Parent & Child Parts Separately

$
0
0
We are trying to plan WIP parts at a different production rate then the FG. When we load a production plan for the WIP part and run MRP the results include the FG demand in the MRP calculations.

How do schedule FG and WIP separately without having the demand from FG included in the MRP result of WIP?